call us on: +86-571-86059127  E-mail: uking@ukingadhesive.com  
Uking Industrial Co.,Ltd
Tel: +86-571-86059127
E-mail: uking@ukingadhesive.com
Product Categories
News
Home > News > Content

Waterproof Coatings The Powder Is Mixed With The Additive

Edit:Uking Industrial Co.,Ltd   Date:Aug 17, 2017

Waterproof Coatings The powder is mixed with the additive

What kind of waterproof material is good?

Roof high-elastic waterproof waterproof plastic from high-density powder and liquid polymer additives and other components. Powder mixed with the additive, the chemical reaction, the formation of a layer of tough elastic waterproof film, the film on the concrete and mortar has good adhesion, with which the formation of a tight and permanent combination of permanent, to prevent the penetration of water.

Applicable scope

1, the roof of the building roof, slope and green roof of the overall waterproof

2, basement, concrete floor, floor beam, shear wall, retaining wall

3, tunnels, subway projects, drains, elevator wells, sluices, sewage treatment tank waterproof

4, through the wall, down the water pipe, expansion joints, sub-grid of the seal, to strengthen the treatment.

Features:

1, with the substrate bonding strength, the active ingredient in the slurry can penetrate the cement surface of the pores, microcracks and produce cross-linking reaction: the integration of the substrate and the formation of a layer of dense crystal waterproof layer.

2, excellent waterproof and impermeability, both for the surface, but also for the back surface waterproof.

3, has a good permeability, keep the matrix dry.

4, the main material of this product is inorganic materials, anti-aging, non-toxic, tasteless, non-polluting, environmentally friendly.

Precautions:

1, after the product is recommended to run out of a one-time, failed to use the material to be completely sealed.

2, when the product storage period is longer, the product surface will form a layer of glue, when used to shave does not affect the product effect.

3, the construction temperature should be above 5 ℃, the construction to maintain the construction environment, air circulation.

4, the coating is not dry before the construction in the waterproof layer of walking and stacking heavy objects and sharp objects to prevent damage to the waterproof layer.

Storage and transportation:

1. Storage products should be sealed and stored in the warehouse, and ventilated cool shelf life of 12 months.

2. Transport: transport in the prevention of sun and rain, to prevent the collision, to keep the packaging intact

Product specifications: 20kg / barrel, 10kg / barrel, 5kg / barrel.

Theoretical consumption of paint:

0.8-1.2 square / kg / times. Due to the actual construction of the rough surface and dilution ratio is different, the amount of paint consumption is also different.


Contact Us
Address:5# Building ShenXin Square, 2888 # Jiu Xin Road, Songjiang District, Shanghai City
Tel: +86-571-86059127  Fax:86-571-86059127
E-mail:uking@ukingadhesive.com
Copyright © Uking Industrial Co.,Ltd